Relevant Publications and Downloads
A theorectical assessemnt of the ProLock System, taking into account different ground conditions and water saturations levels. Note this report is for information only the section Modulus for Prolock in this report is actually overstated at 300cm3/m, rather than 260 cm3/m, but its assessment of load senarios does make an interesting read. With all applications please use the services of a qualified engineer to esnure that these products are suitable for your application.
ProLock :
only the wall : 260 cm3/m' (Tauw-report : 300 cm3/m'; not correct)
piles 150 mm (deal wood) : 331 cm3
2 piles per m' : 663 cm3/m'
wall and 2 piles per m' : 923 cm3/m' (only below the waterlevel, wood can rot near the waterlevel)